Matagarup Bridge
Optus Stadium
client
Main Roads WA
Project
Contracted by Main Roads WA to undertake Quality Inspections of the Matagarup Bridge
Location
The Bridge connects East Perth at Nelson Crescent, south of Nile Street, with Optus Stadium
Services
Quality Management, Fabrication Management, Welding Inspection, Coating Inspection Overseas Inspection, Welding Procedure Qualifications, Welder Qualifications, Supply of Equipment
Contract Duration
20 Months
The bridge is approximately 72 metres tall at its highest point and stretches 370 metres from bank to bank, with a steel cable-stay span of 160 metres at its centre. There are approximately 8 metres between the water and the underside of the bridge. It is at least nine metres wide, wider at pause points.
Quality Management and Inspection Services
Reports submitted
+
Inspectors Engaged
+
Subcontractors